Search This Blog

Tuesday, February 22, 2011




Advanced HP Automation Tools Training

Quality Center Foundation 
·         Introduction
·         Working with releases
·         Defining test requirements
·         Analyze requirement risks
·         Exporting data from Ms Excel to QC
·         Test Planning
·         Test execution
·         Defect Tracking
·         Reporting and Analysis
Advanced QC for QC admin 
·         Introduction to QC
·         Planning the QC implementation
·         Introduction to site administration
·         Customization projects at a global level
·         Maintaining QC projects
·         Customizing users at a global level
·         Customization of other QC modules at global level
·         Customizing lookup lists
·         Managing project-specific users and user groups
·         Customizing mailing options and alert rules
·         Customizing Alert rules
·         Customizing work flow
·         Implementing work flow using the script editor. 
Quick Test Professional Foundation
·         Introduction to Automation testing
·         Automation concepts
·         Test Automation Planning
·         Automation Frameworks
·         Basics of QTP(Recording modes ,run modes, Analyze test  result, record and run settings, global test settings)
·         Creating a test
·         Working with objects
·         Maintain object Repositories
·         Enhance the basic test
·         Reusable and multiple actions
·         Parameters and data driving
·         Using standard checkpoints
·         Custom checkpoints
·         Database checkpoints
·         Synchronization
·         Using data table object
·         Recovery Scenario
·         Descriptive programming
·         VB scripting 
Advanced QTP
·         Introduction
·         Introduction to Expert view
·         Using experts view
·         Working with object properties
·         Working with dynamic objects
·         Object repository (Administration and maintenance)
·         Working with Dynamic Data
·         Retrieving External data
·         Creating new procedures
·         Managing Quick test Exception handling
·         Using VB script operators, statements and functions
·         Demo on how to integrate QC and QTP
Load Runner Foundation

·         Performance testing basics
·         Planning an effective scenario
·         Introduction to LR
·         Installation of LR components
·         Virtual User Generator
·         VuGen scripting Basics with web protocol
·         Adding verification points
·         Parameterization
·         Correlation
·         Different views
·         Error handling
·         Introduction to Scenarios
·         Scheduling Scenarios
·         Scenario Execution
·         Result Analysis
Load Runner Advanced 
  • Introduction of VuGen
  • Identify the main components of VuGen interface
  • Recording for the Web
  • Replay
  • Transactions
  • Parameters
  • Auto Correlation after Recording
  • Verification
  • Actions
  • Introduction to Script View
  • Advanced Scripting Techniques
  • Manual Correlation
  • Auto Correlation during Recording
  • Error Handling
  • Enhancing the Script to simulate the Real User

Upcoming Batches:
QC
Weekday: 18th October’11 (9- 12 Noon)   
Weekend: 29th October’11 (10- 2 PM) 


QTP
Weekday: 10th October’11 (11- 2 PM)

Weekend: 16th Octoberer’11 (10-2 PM)(only Sunday Batch)

LR
Weekday:  17th October’11 (11- 2 PM) 

Weekend:  29th October’11 (2- 6 PM)

CONTACT DETAILS: 
GTEN Technologies Pvt. Ltd.
Address: B-51, Sector-6, Noida, U.P.
Phone Number - 0120 - 4102991; +91 08800577488
Website:  http://www.gten4u.com
Email id:  training@globaltestingexperts.com

No comments:

Post a Comment